Schofield



Schofield
Aqua Engineers was awarded the Privatization of the Wastewater Treatment Plant and Distribution System at Schofield Barracks, on the island of Oahu, Hawaii. The contract involves operation and ownership of the Schofield Barracks WWTP, 17 WWPSs, approximately 70 miles of gravity sewers, and numerous grease traps and oil/water separators. The Schofield Barracks WWTP has a current design capacity of 4.2 mgd. The scope of work of our contract includes upgrading the existing secondary R-2 treatment plant to R-1 standards and installing a SCADA system within the first 2 years of the contract. Additional projects scheduled for the first 2 years include pump station upgrades, oil/water separator and grease trap upgrades, and development of a comprehensive collection system maintenance and repair/rehabilitation project prioritization program.